BIM Services-Event Space Center

BIM (LOD 400) service for architectural, strutal and MEPF with clash-detection and coordination for an event space in USA



Client Profile

A leading construction company specializing in commercial building development, USA


Industry

Recreation (Convention & Exhibit Center)


Challenges

Multiple changes in the elevation design required to be accommodated in the stipulated time-frame.

Required collaboration between all the stakeholders involved in the building construction project.


Solution

BIM-ready models were developed for architectural, structural and MEP designs for the event space center. Our team also provided structural steel detailing along with erection drawings. We also developed Revit family for Air Handling Units (AHUs) for the MEPBIM model. The final BIM-ready model was also checked for clash detection.

Multiple design changes were accommodated in the model as per the client requirements including changes in ductwork, elevation height and addition of beams.

The project was successfully completed within a duration of 2 months.


Technology Used

Tekla Structures, AutoCAD, Revit & NAVISWORKS


Business Benefits

  • BIM-ready 3D model enabled the client to extract quantities and take informed decisions throughout the project.

  • Significant cost savings by eliminating 2D workflows

  • BIM workflows also provided the client with an opportunity to implement facility management for better control over the building post construction.